Chapter 1 contains the following:

1. INTRODUCTION

1.1. Overview of System X

1.2. Purpose of this Document

1.3. Formal Reviewing

1.4. Objectives of System Test


1. INTRODUCTION

1.1. Overview of System X


To aim of this phase of the project is to implement a new X System platform that will enable:


This programme will result in significant changes to the current departmental and inter-office processes. The functionality will be delivered on a phased basis.

Phase 1 will incorporate the following facilities :

[Detailed inclusions are listed later in this document]

1.2. Purpose of this Document


This document is to serve as the Draft Test Approach for the Business Systems Development Project.

Preparation for this test consists of three major stages:-

 

1.3. Formal Reviewing

There will be several formal review points before and during system test. This is a vital element in achieving a quality product.

1.3.1. Formal Review Points

1. Design Documentation
2. Testing Approach
3. Unit Test Plans
4. Unit Test Conditions & Results
5. System Test Conditions
6. System Test Progress
7. Post System Test Review

 

1.4. Objectives of System Test

At a high level, this System Test intends to prove that :-

[Detailed objectives are listed later in this document.]

 

1.4.1. Software Quality Assurance involvement


The above V Model shows the optimum testing process, where test preparation commences as soon as the Requirements Catalogue is produced. System Test planning commenced at an early stage, and for this reason, the System test will benefit from Quality initiatives throughout the project lifecycle.

The responsibility for testing between the Project & Software Qualtiy Assurance (S.Q.A.) is as follows: